|
In HT line survey we used trace the 33/11 Kv line starting from GSS.The surveyor usually visit pole by pole with the help of DGPS (PDA) instrument. During the field survey we collect all assets (Pole tower, Fuse, DTR, Switch, Support, RMU etc) detail in our respective formats. |